Refurbishment of two school wings

Re-purposing 2 wings of an operational primary school. Phase 1 creating a SEN wing – Phase 2 creating a Children’s centre.

Location: Bellefield Primary School

Client: Equamead Academy

Project value: £250k

Duration: 11 weeks over two phases

The challenge

Working in a live environment and working within the existing fabric to accommodate the specialist LED lighting, HVAC and flooring.

Scope of works

  • Full strip out of the existing footprint of the school’s wings including wall structures and all internal flooring, ceilings, fittings and fixtures 

  • Re-building the internal walls and ceilings to the new design including all fixtures and fittings 

  • Installing new washrooms including new plumbing and waste connections 

  • Full LED installation including SEN lighting schemes

  • SEN Noise compliant digitally controlled HVAC system installation 

  • Full decoration throughout. Installation of sound reducing ceilings and flooring

Delivered to program

Delivered within budget

High quality finish

Positive client feedback

Planning a similar project?

Contact CJC Construction Group Ltd to discuss your requirements.

Contact us

Results

Delivered to program

Delivered within budget

High quality finish

Positive client feedback

bottom of page